Engineering-plastic parts, made in our own factory.

Engineering-plastic material supply and CNC machining from one supplier. We machine parts in our own factory and confirm material grade, scope and delivery in your written quotation.

Company introduction

Material supply, production and warehousing in one introduction.

Factory & team
English subtitles · 1 min 11 secOpen video

The buyer should be able to trace every important decision.

Trust in custom manufacturing comes from the records tied to the order: revision, material, inspection, change approval, packing and delivery terms.

01

Qualify

Challenge incomplete drawings, unsuitable material assumptions and unclear critical features before price approval.

02

Control

Put revision, quantity, inspection, lead time and commercial exclusions into the written quotation.

03

Repeat

Keep approved evidence linked so the next order starts from a controlled baseline instead of memory.

Claims should survive a purchasing audit.

Project capability is confirmed against the actual part and documented scope, not assumed from a generic marketing statement.

Named drawing revision on the quote
Material grade and substitution boundary
Quantity-based price and lead time
Agreed critical dimensions and evidence
Incoterm with a named place
Buyer approval before controlled changes

Specify the evidence your order requires.

Include required material documents, inspection records and approval criteria in your enquiry. Their availability and scope must be confirmed in the quotation before you place an order.

Have a part to quote?

Send the drawing and the details you have. Request an NDA in the enquiry if needed before technical review.

Request a quotation